Kitchen trades need a named coordinator, but that name alone does not tell you who can change a drawing, accept a different appliance or authorise additional work. Agree those responsibilities with the project team in writing. A builder, project manager, architect, kitchen company or homeowner may take on coordination within an agreed scope; the job title is not a substitute for that agreement.
For homeowners working with an architect or interior designer, the useful question is: who brings the builder, plumber, electrician and kitchen fitter together when one decision affects several of them? Start with the appointments you actually have, then record the gaps. This guide offers a practical discussion record, not an allocation of contractual or statutory duties.
Kitchen planning discussion with material samples and a concept drawing. Nura Interiors. The drawing is not measured construction information.
Separate coordination, technical review and permission to proceed
Coordination means connecting information, people and the programme. Technical review means asking the relevant appointed specialist whether a proposal works within their scope. Permission to proceed means the instruction given through the project's agreed authority. These can involve different people.
A client may choose the appearance of an integrated dishwasher front without having checked the replacement appliance's fitting requirements. A designer may agree the visual arrangement without being appointed to instruct the electrician. A fitter may identify a clash without having authority to change the client's specification. Record each contribution rather than treating a general approval email as permission for everything.
If you employ trades separately, discuss explicitly who will organise the interfaces between them and who can instruct each appointment. Do not assume that a supplier providing kitchen drawings has accepted management of the wider building work.
Turn the team list into a decision record
Use the following as a meeting aid. Replace the prompts with actual names, agreed scope and document references. One person can appear in several places, but leave no responsibility hidden behind “the team”. An unanswered entry is an open question, not a completed approval.
| Decision | Input to agree with named people | Record before proceeding |
|---|---|---|
| Kitchen layout and appliance selection | Who confirms the client's choices, who develops the cabinet arrangement and who reviews the proposed interfaces? | Current plan and appliance references; named reviewers; unresolved points and the person authorised to instruct the next step. |
| Service positions | Who provides appliance information, prepares the relevant information and checks it against the actual site? | Agreed drawing issue, specialist responses and who communicates any change to affected trades. |
| Cabinet and worktop junctions | Who checks the furniture, worktop and adjoining finishes together? | Agreed junction information and any supplier or site checks still required before ordering or measuring. |
| Readiness for the next visit | Who confirms the receiving team's requirements and checks whether preceding work meets them? | A dated confirmation, outstanding work, its named owner and whether the visit can proceed. |
| A change to agreed work | Who assesses design, technical, price and programme effects, and who may authorise the instruction? | Proposed change, responses, accepted consequences, revised information and recipients. |
Keep this responsibility record beside the current drawing list. Our guide to kitchen shop drawing review explains the difference between commenting on appearance and approving the information for a particular purpose.
Worked example: the dishwasher model changes
Imagine a client selects a different integrated dishwasher after the kitchen layout has been agreed. The new model looks suitable in a product photograph. That does not establish that the existing cabinet front, installation arrangement or service information remains suitable.
First, record the exact proposed model and ask the relevant appointed specialists to review its manufacturer's information against the current design and site. The kitchen designer or furniture supplier can be asked about the cabinet arrangement; the fitter about installation interfaces; the relevant service trades about their work. Confirm who is actually appointed to provide each response.
The coordinator gathers those answers and identifies any drawing, order, cost or programme changes requiring a decision. The person authorised under the project arrangements then gives the instruction. Keep the previous issue in the project history and identify which revised information replaces it. A useful close-out note says who received the change, what remains unresolved and which work is authorised to continue.
This is a hypothetical coordination example, not a dishwasher installation specification. Use the selected product's actual instructions and the appointed specialists' advice for the technical requirements.
Make site readiness a handover between people
Avoid a universal checklist that assumes every kitchen has the same floor, worktop or installation sequence. Ask the receiving installer or supplier what must be ready for their visit, which information they need and who will confirm it. Agree the relevant checks with the people responsible for the preceding work.
For example, if a worktop visit depends on the furniture being in an agreed condition, identify who confirms that condition and who books the visit. If something is incomplete, record the consequence and the next decision rather than describing the room as ready in a general message.
Keep the coordination record distinct from the kitchen renovation timeline. The programme says when work is intended to happen; the responsibility record says who supplies the information and confirms the next handover.
Bring the unresolved interfaces to the design conversation
Prepare the current plan, appliance references, list of appointed trades and the questions nobody has yet accepted. Include client-supplied items, such as a tap or decorative light, so the team can identify where another supplier's information is needed. Ask what the kitchen company's proposed scope includes and which wider responsibilities remain elsewhere.
Explore Nura's information for architects and designers and bespoke kitchen services, then contact the studio with that brief. The purpose is to clarify how the cabinetry design fits the wider project and which interfaces need agreement before the next decision.
Planning your next step
Use this guide as a starting point for your own brief. Compare the room, materials and practical requirements with the way you want the space to work.